– Surface preparation: Surface must be dry, clean, solid, free of grease and impurities. Absorbent surfaces must be saturated with clean water to avoid standing water before applying the first coat.
– Construction method:
• Mixing ratio (by volume): Component A : B = 1 : 2
• Construction:
+ Shake component A well, slowly add component B and mix well with a low speed mixer (500 rpm) to form a homogeneous mixture.
+ Use a brush or roller to apply the first layer on a still damp surface.
+ Let the first layer dry before applying the next layer.
+ For large surfaces, mortar can be applied using appropriate spraying equipment.
+ You should moisten the first layer before applying the second layer.
+ Apply 2 – 3 layers.
– Cleaning: Clean tools and equipment immediately after construction with clean water.
– Safety instructions: Alkaline products can cause skin allergies. Wear appropriate safety glasses and gloves when working.
– Storage: Cool, dry, shaded place.
– Expiry date: Minimum 6 months from date of manufacture (if stored properly in intact, unopened containers)
Note: The product is for specialized purposes only. Please refer to technical documents and chemical safety documents before use