– Preparation: The surface must be clean, without impurities that reduce adhesion as well as dust, grease or wax. Use appropriate chemicals to treat wall surfaces with obvious moss. For old surfaces, it is necessary to remove the old paint film before applying. Treat wall cracks before construction.
– Wall surface humidity: Below 16% according to a moisture meter or let the surface dry for 21 to 29 days under normal conditions (average temperature below 30oC). Do not apply paint in weather temperatures below 11oC.
– Construction method:
• Stir the paint well before use and apply with a paint brush, roller, or paint sprayer.
• Apply the next layer 2 – 4 hours after the previous layer.
– Cleaning: Clean tools and equipment immediately after construction with clean water.
– Safety instructions: Alkaline products can cause skin allergies. Wear appropriate safety glasses and gloves when working.
– Storage: Cool, dry, shaded place.
– Expiry date: Minimum 12 months from date of manufacture (if stored properly in intact, unopened containers)
Note: The product is for specialized purposes only. Please refer to technical documents and chemical safety documents before use